Skip to content
Pol-Med
Hydraulic Brake System Demonstration
Hydraulic Brake System Demonstration (view 2)
Education

Demonstration station

Hydraulic Brake System Demonstration

Demonstration bench showing hydraulic brake operation with front/rear circuit pressure simulation.

Price on request

Pricing determined individually after a conversation and funding-programme qualification.

Eligible for funding

FERSKPO-BCUErasmus-CoVE

Gallery 1 / 2

Complete hydraulic brake system with master cylinder, vacuum booster, ABS modulator and wheel calipers. Students measure pressures in front- and rear-axle circuits, observe ABS cycling, and assess the impact of air in the system. Measurement scope aligned with MOT.05/MOT.06 qualifications.

  • Front/rear circuit pressure measurement
  • ABS modulator operation simulation
  • MOT.05 and MOT.06 compliant

Technical specs

Power
230V / 16A
Working pressure
0–150 bar
Footprint
1,8 × 0,9 m
Weight
190 kg

What sets this station apart

  • Front/rear circuit pressure measurement
  • ABS modulator operation simulation
  • MOT.05 and MOT.06 compliant

Certifications and compliance

  • CE
  • PN-EN

Installation and requirements

Lead time
6–8 weeks
Install duration
2 days
Floor space
6 m²
Power
230V / 16A
Compressed air
Ventilation
no

Curriculum alignment

Qualifications

  • MOT.05
  • MOT.06

Prerequisite knowledge

  • Vehicle hydraulics fundamentals
Programme level
Technical secondary school
Recommended hours
25 teaching hours

Warranty and service

Warranty
24 months
Parts availability
10 years
Response time
48 h
Remote diagnostics
yes

Eligible for funding

Eligible programmes

  • FERS
  • KPO-BCU
  • Erasmus-CoVE

Tender support pack

OPZ fragment compliant with PZP Article 99, evaluation criteria and supporting cost estimate — ready for the procurement file.

Inquiry about this station

Submit the form — we reply within one business day. No sales pitch.

Ask about a station or the Platform

No sales pitch. We reply within one business day. For funded procurement we help shape your OPZ fragment and supporting cost estimate.

What to expect

  • A direct answer about the station and the funding programme
  • A scope-of-work draft tailored to your tender (FERS / KPO / Erasmus+)
  • Supporting cost estimate for your application paperwork
  • Reply within 24 business hours

Ask about a station or the Platform

Inquiry about

Hydraulic Brake System Demonstration